No |
Project Name |
Client |
Location |
Date |
|
28 | Drain 22 Pumping Station |
Ministry of Water Resources |
Babel | 2007/2008 | Construction of a new pumping station near Musaib city . Work included the construction of concrete water intake and concrete base platform according, installation of eight 75kw vertical axial flow SIGMA pumps with 600mm delivery pipes and all related electrical controls and instrumentations |
27 |
MANDLI 1 Pumping Station |
Ministry of Water Resources |
Diyala |
2006/2007 |
Installation, test, operation and commissioning of five 650 KW, 6.6 KV vertical pumps with all related mechanical and electrical equipment. |
26 |
NAHRWAN Potable Water Systems |
Ministry of Municipality and Labor |
Baghdad |
2005 |
Design, supply and installed new water distribution network, including water main feeders, laterals and house connections |
25 |
AL-KEFEL new potable Water Distribution System |
Ministry of Municipality and Labor |
Babil |
2005 |
Design, supply and installed new water distribution network, including water main feeders, laterals and house connections |
24 |
Rehabilitation of Jissir and Abu Graib sewerage |
International Committee of The Red Cross |
Baghdad |
2004 |
Work included cleaning and unplugging main sewers, installation of new lifting pumps |
23 |
Supply of utility trucks |
Municipility of Romadi |
Iraq |
2004 |
Contracts included the supply of a Sewage Vacuum Truck, 5,000 gallons capacity, Septic vacuum trucks 4000 gallons and water tank trucks 15000 gallons |
22 |
Manufacturing of kiosk substations |
Takaful Co./ Baghdad |
Baghdad |
2004 |
Manufacturing and supplying of 28 Nos. of 11/0.4 KV 1000/1600 KVA Kiosk substations |
21 |
Rehabilitation of Madan Water Treatment Plant 5300m3/hr |
International Committee of The Red Cross |
Madan |
2003/ 2004 |
The work included the rehabilitation of Chemical equipment, sedimentation tanks, scrapers, sand filters and pumping stations at low lift and high-lift
|
20 |
Rehabilitation Of Madan Boosting station 24000m3/day |
International Committee of The Red Cross |
Madan |
2004 |
. Work included supply and laying of ductile piping, engaging the boosting station with the existing network for the city and rehabilitation of storage tanks |
19 |
Rehabilitation Of Jissir Water Boosting Station 1200m3/hr |
International Committee of The Red Cross |
Baghdad |
2003 |
Work included erecting new pumps, cleaning storage tanks, renovating the chlorination system, and modifying main 600mm ductile lines.
|
18 |
Manufacturing of kiosk substations |
TikretUniversity |
Tikrit |
2002 2003 |
Manufacturing and installing 23 Nos. of 11/0.4 KVA 630/1000 KVA Kiosk substations
|
No |
Project Name |
Client |
Location |
Date |
Project Description
|
17 |
Erecting new pumps production line |
NAJD Pump Manufacturing Establishment |
Sult/ Jordan |
2002 |
Work included designing, selecting equipment , erecting and operating mechanical manufacturing procedures for process pump production . |
16 |
Construction of DIJLA Group Complex |
Dijla Group |
Baghdad |
2002 |
Work included design and implementation of Hydro utility work for 60 apartment and office buildings plus emergency power supply system |
15 |
Construction of AL-Bazoon Water Treatment Plant 1200m3/day |
International Committee of The Red Cross |
Mission |
2000-2001 |
A turnkey project, The work included the Supply of all materials, construction, erection and commissioning of civil constructions, piping, steel structures, water tanks, concrete filters, electrical power supply, pumps erection, installation of chlorination units, pressurized sand filters and connecting to main city lines. |
14 |
Construction Water System for Hilla General Hospital |
International Committee of The Red Cross |
, Babylon |
2001 |
Work included the Supply and erect a water pumping station, ground concrete tank, and elevated circular concrete tank, plus the design, construction and erection of an underground wastewater pumping station. |
13 |
Design and construction of Karama Teaching Hospital Waste Water Systems. |
International Committee of The Red Cross |
Baghdad |
2000-2001 |
Work included Supplying and erecting water pumping station, meter Ground concrete tank, and elevated pressed steel tank, plus the design, construction and erection of an underground wastewater pumping station. |
No |
Project Name |
Client |
Location |
Date |
Project Description
|
12 |
Baji power station |
ANSALDO Italy |
Baiji Power plant |
1999 |
Location Baji power station at Baji 225 km north of Baghdad Subcontract to rehabilitate the local instrumentation for turbine house and boiler for units five and unit 6, 220 MW each.
|
11 |
Dora power station |
University of Technology |
Dora -Baghdad |
2000 |
Subcontract to rehabilitate the local instrumentation for turbine house and boiler for units 3,4,5,6, 160 MW each |
10 |
Main power supply for KUT emergency hospital. |
Premier Urgence Aid Humanitarian |
Kut |
2000 |
Design of main 2000 Amp electrical power boards and emergency power supply and generators |
9 |
Firefighting system for Assass Transmitters site |
Ministry Of Industry. |
Abu Ghraib |
1999 |
Supply and Install the fire fighting system for the fuel tanks, including pumps, boosters, piping, control and instrumentation.
|
8 |
Design of Fire fighting system for Baghdad Cigarette factory |
Ministry Of Industry. |
Baghdad |
1997 |
Supply and Install the fire fighting system, water tanks, pumps, boosters, piping, control and instrumentation.
|
7 |
Rehabilitation of Water storage for AL-Kindi hospital |
Premier Urgance Aid Humanitarian |
Baghdad |
1998 |
Supply and install two 400 cubic meter pressed steel water tanks with Epoxy treatment |
6 |
Rehabilitation of steam boilers Zahrawi General Hospital |
Premier Urgance Aid Humanitarian |
Mousel |
1998 |
Complete renovation of main two 5 Ton, 10 bar steam boilers including all utility equipment, softeners, pr-heating tanks and electrical control boards . |
No |
Project Name |
Client |
Location |
Date |
Project Description
|
5 |
Rehabilitation 28 Nissan complex water system |
United Nations ( UNHCS ) |
Baghdad |
2000 |
Supply and erect new pumps, design new automatic control panels and renovate and recalibrating pressurized boosting systems. |
4 |
Electromechanical rehabilitation work for ALKINDI General Hospital |
Ministry Of Health |
Baghdad |
1999 2000. |
Implementation of new leading electrical supply network. Erection of heat exchangers with sensors and controls Supply and erection of a new internal telephone communication network. |
3 |
Design and Implementation of Pressurized Water Boosting Systems for KINDIGeneralHospital |
Premier Urgance Aid Humanitarian |
Baghdad |
1997-1998 |
Supply erecting and commissioning for two pressurized water boosting systems after a complete study for primary water city sources, available water storage capacity, Hospital water demand and emergency electrical power supply to maintain water supply in all working conditions. |
2 |
Design and operate a hydraulic test station |
AL-Shams Co. |
Baghdad |
1995 |
Complete test bench for process pumps hydraulic performance test and calibration per BS standards and engineering codes meeting best operation point for customers process application. |
1 |
Design and manufacturing of low-speed mixers for the Tikret Water Treatment plant |
Ministry Of Industry |
Tikrit |
1993 |
Manufacture and erect main low-speed mixers 2000mm diameter, 40 kw for sedimentation tanks of Plant |
Sigmainvest Engineering
Czech Republic
Dar Alraeen for commercial agencies
Baghdad-Iraq
Caprari pumps
Modena-Italy